Energy Performance of Buildings Directive (EPBD IV)
EPBD IV is Directive (EU) 2024/1275, the recast Energy Performance of Buildings Directive. The Netherlands put its first tranche into force on 29 May 2026 (Stb. 2026, 103), with duties staged to 2033: recharging points in existing car parks from 1 January 2027, solar and lighting control from 1 January 2028. Energy label D by 2030 is still a proposal.
- Type
- Regulation
- Published
- Reading time
- 5 min
Which EPBD IV duties apply to building owners in the Netherlands, and from when?
EPBD IV is Directive (EU) 2024/1275, the recast Energy Performance of Buildings Directive. Member States had to transpose most of it by 29 May 2026. The Netherlands brought its first tranche into force that day through Staatsblad 2026, 103, an amendment of the Besluit bouwwerken leefomgeving (Bbl) whose parts take effect in stages up to 1 January 2033. For existing commercial buildings the first new duty falls on 1 January 2027: a car park with more than 20 spaces needs one recharging point for every ten spaces, or ducting for half of them.
Energy label D by 2030 for the worst-performing non-residential buildings is not law yet. RVO describes it as an obligation from 1 January 2030, but as at 14 October 2026 it sits in the third Dutch tranche, which the government plans to adopt in 2027. This page labels it Proposed wherever it appears.
Last updated: 14 October 2026. Checked against the Official Journal text of Directive (EU) 2024/1275, the text of Staatsblad 2026, 103, the second-tranche consultation page and the RVO, IPLO and European Commission pages listed under sources.
At a glance
Official title
Directive (EU) 2024/1275 of the European Parliament and of the Council of 24 April 2024 on the energy performance of buildings (recast)
CELEX
32024L1275 · Annex III replaced by Delegated Regulation (EU) 2026/52 on the calculation of life-cycle global warming potential
OJ
OJ L, 2024/1275, 8.5.2024
In force
28 May 2024, the twentieth day after publication (Article 37)
Transposition
By 29 May 2026 for Articles 1 to 3, 5 to 29 and 32 and most annexes (Article 35(1)) · Article 17(15), the end of subsidies for stand-alone fossil fuel boilers, by 1 January 2025
Repeals
Directive 2010/31/EU, with effect from 30 May 2026 (Article 36)
Scope
Addressed to Member States, which place the duties on owners of new and existing buildings · the heaviest duties fall on non-residential buildings and on buildings owned by public bodies
Dutch implementing act
Besluit van 21 april 2026, Stb. 2026, 103, published 7 May 2026 · in force 29 May 2026, with parts from 1 January 2027, 2028, 2029, 2030, 2031 and 2033 (Article IV)
Supervisor (NL)
Municipality or omgevingsdienst for the Bbl building rules · ILT for the energy label at sale, rental and delivery
Further Dutch tranches
Second tranche consulted 29 April to 26 May 2026 · third tranche (minimum standards) planned for adoption in 2027 · fourth planned for 2029 (IPLO, 4 September 2026)
What changes for building owners under the Dutch rules?
The first tranche changes five things an owner of a non-residential building will notice. The before column is the rule as RVO describes it; the after column comes from Stb. 2026, 103 and RVO.
| Topic | Before EPBD IV | Under the Dutch EPBD IV rules |
|---|---|---|
Building automation (GACS) | Required from 1 January 2026 for non-residential buildings with heating or cooling above 290 kW | Automatic lighting control added from 1 January 2028 · threshold falls to 70 kW from 1 January 2030 |
Recharging points in existing car parks | n/a | More than 20 spaces: one recharging point per ten spaces, or ducting for 50% of spaces, from 1 January 2027 |
Solar energy on existing buildings | No specific duty | Buildings of public bodies above 2,000 m² from 1 January 2028 · non-residential buildings above 500 m² at permit-requiring roof or installation works from 1 January 2028 |
Energy label for monuments | Exempt | Required in the same situations as other buildings since 29 May 2026 |
Inspection reports for heating and air conditioning | Stored in the RVO inspection portal | No longer stored there from 1 July 2026; the GACS duty takes over |
Who is in scope?
The Directive binds Member States. Its duties reach a business through national law, and in the Netherlands that law is the Bbl. Three groups carry most of the new Dutch duties.
Owners of non-residential buildings (utiliteitsgebouwen): offices, shops, schools, healthcare buildings, hotels and other buildings not used for housing. They carry the car park, building automation, solar-at-renovation and energy label duties, and from 2030 the proposed minimum standard. A bank, insurer or pension fund meets these rules as the owner or user of its offices and as the owner of the buildings it holds as investments.
Public bodies that own buildings. They meet the earliest solar duty (existing buildings above 2,000 m² from 1 January 2028), pre-cabling for half their parking spaces from 1 January 2033 and, under Article 7 of the Directive, zero-emission new buildings from 1 January 2028.
Developers of new buildings. Every new building must be zero-emission from 1 January 2030. New buildings above 1,000 m² need a life-cycle global warming potential figure in their energy performance certificate from 1 January 2028.
Size thresholds decide most cases: more than 20 parking spaces, more than 500 m² for solar at renovation, 290 or 70 kW of heating or cooling capacity for automation. Offices have needed label C since 1 January 2023, unless office use is under 100 m² or under half the floor area (RVO).
Homes are treated differently. Article 9(2) asks each Member State for a national trajectory that lowers the average primary energy use of residential buildings by at least 16% against 2020 by 2030 and by 20 to 22% by 2035. That is a target for the state, not a duty on each home.
What does EPBD IV require?
Six duty sets matter to building owners. Each card names the Directive article and, where one exists, the Bbl article that carries it into Dutch law.
Article 10 · Bbl 3.86a
Solar energy
Existing buildings of public bodies above 2,000 m² must generate solar energy on the building from 1 January 2028; the threshold falls to 750 m² in 2029 and 250 m² in 2031. Non-residential buildings above 500 m² meet a solar requirement from 1 January 2028 when roof or installation works need a permit. New non-residential buildings meet Article 10(3)(a) through the existing BENG renewable share.
Article 14 · Bbl 3.87b, 4.160a
Recharging points and bicycle parking
Since 29 May 2026, new or majorly renovated non-residential buildings with more than five spaces need one recharging point per five spaces (per two at offices), pre-cabling for half the spaces and ducting for the rest. Existing buildings with more than 20 spaces follow from 1 January 2027. Bicycle parking for new buildings runs through the municipal omgevingsplan (Bkl 5.131b).
Article 13 · Bbl 3.145
Building automation and lighting control
Non-residential buildings heated or cooled for people need a building automation and control system above 290 kW of capacity. Automatic lighting control is added from 1 January 2028, and the threshold for both falls to 70 kW from 1 January 2030.
Article 19
Energy performance certificate
Since 29 May 2026 the Dutch label has a new design, monuments are no longer exempt, a label is required after a major renovation, and every building of a public body and every office needs a valid one. RVO expects a new A to G scale in 2030; Article 19(2) lets states that rescaled between 2019 and May 2024 wait until 31 December 2029.
Article 9
Minimum energy performance standards
The Directive requires non-residential buildings to be below a 16% threshold from 2030 and a 26% threshold from 2033, measured against the national stock on 1 January 2020. The Dutch proposal sets label D by 1 January 2030 for the worst performers. The 2033 Dutch level has not been set.
Article 7
Zero-emission and life-cycle emissions
New buildings owned by public bodies must be zero-emission from 1 January 2028 and all new buildings from 1 January 2030. The life-cycle global warming potential goes on the certificate from 1 January 2028 for new buildings above 1,000 m², and for all new buildings from 2030. The Dutch rules sit in the draft second tranche.
The dates
2024
Set by law
Directive (EU) 2024/1275 published in the Official Journal
Calculated
Directive (EU) 2024/1275 enters into force
Article 37: the twentieth day after publication.
Set by law
Building automation for non-residential buildings above 290 kW (Article 13)
The Dutch rule applies from 1 January 2026; see that entry.
2025
Set by law
No more financial incentives for stand-alone fossil fuel boilers (Article 17(15))
Article 35(1) required this provision to be transposed by the same date.
2026
Set by law (Bbl, as stated by RVO)
Building automation required in the Netherlands for non-residential buildings above 290 kW
Set by law
First Dutch tranche published as Staatsblad 2026, 103
The decree is dated 21 April 2026.
Calculated
Delegated Regulation (EU) 2026/52 enters into force, replacing Annex III on life-cycle global warming potential
Published 4 May 2026; in force on the twentieth day after publication (Article 2).
Set by the Ministry of BZK
Consultation on the second Dutch tranche closes
It opened on 29 April 2026.
Set by law
Transposition deadline for Articles 1 to 3, 5 to 29 and 32 (Article 35(1)); new certificate template with a closed A to G scale (Article 19(2))
Set by law
First Dutch tranche enters into force (Stb. 2026, 103, Article IV(1))
Recharging points and pre-cabling for new and majorly renovated non-residential buildings, the bicycle parking rule in the Bkl and the energy label changes.
Set by law
Directive 2010/31/EU repealed; Articles 30, 31, 33 and 34 apply (Articles 36 and 37)
Set by RVO
Heating and air conditioning inspection reports no longer stored in the RVO inspection portal
Set by the European Commission
Letters of formal notice to all 27 Member States for incomplete transposition
Member States had two months to reply.
Set by law
Solar installations on new public and non-residential buildings above 250 m² (Article 10(3)(a))
The Netherlands relies on the existing BENG renewable share requirement for these buildings.
Set by law
Member States submit their first national building renovation plan (Article 3(7))
2027
Indicative: RVO, 23 September 2026
Second Dutch tranche enters into force
Set by law
Existing non-residential buildings with more than 20 parking spaces: one recharging point per ten spaces or ducting for 50% (Article 14(2); Stb. 2026, 103, Article IV(2))
Buildings renovated between May 2024 and May 2026 have until 1 January 2029.
Proposed (draft second tranche)
Stricter energy performance requirements for healthcare buildings with beds, sports buildings and other lodging functions
Indicative: RVO, 23 September 2026
Third Dutch tranche enters into force: minimum standards for non-residential buildings
2028
Set by law
Solar on existing buildings of public bodies above 2,000 m² and on non-residential buildings above 500 m² at permit-requiring works; automatic lighting control above 290 kW (Stb. 2026, 103, Article IV(3))
Set by law
New buildings owned by public bodies must be zero-emission (Article 7(1))
The Dutch rule is in the draft second tranche.
Set by law
Life-cycle global warming potential disclosed in the certificate for new buildings above 1,000 m² (Article 7(2))
Set by law
Commission reviews the Directive (Article 28)
2029
Set by law
Solar on existing buildings of public bodies above 750 m² (Stb. 2026, 103, Article IV(4))
Set by law
Latest date for the new energy label scale in Member States that rescaled between 1 January 2019 and 28 May 2024 (Article 19(2))
2030
Set by law
Building automation and lighting control above 70 kW (Stb. 2026, 103, Article IV(5))
Set by law
All new buildings zero-emission; life-cycle global warming potential for all new buildings (Article 7)
Set by law
Non-residential buildings below the 16% threshold (Article 9(1))
Proposed (third Dutch tranche, not adopted)
Worst-performing non-residential buildings at least energy label D
Indicative: RVO, 23 September 2026
New Dutch energy label scale from A to G
2031
Set by law
Solar on existing buildings of public bodies above 250 m² (Stb. 2026, 103, Article IV(6))
2033
Set by law
Buildings of public bodies: pre-cabling for at least 50% of parking spaces (Article 14(2); Stb. 2026, 103, Article IV(7))
Set by law
Non-residential buildings below the 26% threshold (Article 9(1))
Without an official date
No official dateIndicative: RVO, 23 September 2026
Dutch minimum standard for non-residential buildings in 2033
RVO states the national government still has to set it.
Who supervises EPBD IV in the Netherlands?
No single authority supervises the whole Directive. Enforcement follows the instrument that carries each duty.
| Duty | Who enforces | Source |
|---|---|---|
Building automation (GACS) | Municipality or omgevingsdienst | |
Label C for offices | Municipality or omgevingsdienst, since 1 January 2023 | |
Energy label at sale, rental and delivery | ILT; the owner risks a fine when a valid label is missing | |
Recharging points, solar and lighting control | Not stated per duty; RVO names the municipality or omgevingsdienst as competent authority for the GACS rules in the same Bbl chapter | Our reading |
Transposition by the Netherlands | European Commission |
What has changed?
15 July 2026. The European Commission sent letters of formal notice to all 27 Member States for not fully transposing the Directive.
1 July 2026. Inspection reports for heating and air conditioning no longer go into the RVO inspection portal.
29 May 2026. The first Dutch tranche entered into force on the Directive's transposition deadline.
26 May 2026. The consultation on the second Dutch tranche closed. It covers zero-emission new buildings for public bodies, the life-cycle calculation for new buildings above 1,000 m² and stricter insulation requirements.
24 May 2026. Delegated Regulation (EU) 2026/52 entered into force and replaced Annex III, the Union framework for calculating life-cycle global warming potential.
7 May 2026. Staatsblad 2026, 103 was published, three weeks before the transposition deadline.
Check your buildings against the Dutch thresholds
Book a working session and we will test your buildings against the Bbl thresholds and dates, naming the article and the source for each conclusion.
Questions and answers
Does EPBD IV apply directly to my company?
No. EPBD IV is Directive (EU) 2024/1275 and binds Member States, not companies. In the Netherlands its duties reach building owners through the Besluit bouwwerken leefomgeving, amended for the first tranche by Staatsblad 2026, 103, which entered into force on 29 May 2026.
Does my office need energy label D by 2030?
Not under current Dutch law. RVO describes label D by 1 January 2030 for the worst-performing non-residential buildings, but as at 14 October 2026 that rule sits in the third Dutch tranche, planned for adoption in 2027. Offices already need at least label C, which municipalities have enforced since 1 January 2023.
Do I have to install recharging points in an existing car park?
Yes, if the car park belongs to a non-residential building and has more than 20 spaces. From 1 January 2027 the Bbl requires one recharging point for every ten spaces, or ducting for at least half of them. Buildings renovated between May 2024 and May 2026 have until 1 January 2029.
When does a non-residential building need building automation?
In the Netherlands, non-residential buildings with heating or cooling above 290 kW have needed a building automation and control system since 1 January 2026, according to RVO. Automatic lighting control is added from 1 January 2028, and the threshold falls to 70 kW from 1 January 2030 under Staatsblad 2026, 103.
Are solar panels mandatory on existing commercial buildings?
Not in general. From 1 January 2028 a non-residential building above 500 m² must meet a solar requirement when it undergoes roof or installation works that need a permit. Existing buildings of public bodies face a direct duty from 1 January 2028 above 2,000 m², 2029 above 750 m² and 2031 above 250 m².
Who enforces the EPBD IV rules in the Netherlands?
The municipality or the omgevingsdienst enforces the building rules in the Bbl, such as building automation and the label C office duty. The ILT checks that a valid energy label is present at sale, rental and delivery of a building, and the owner risks a fine when it is missing.
Did the Netherlands transpose EPBD IV on time?
Partly. The transposition deadline was 29 May 2026, and the first Dutch tranche entered into force that day, but the second, third and fourth tranches follow between 2027 and 2030. On 15 July 2026 the European Commission sent letters of formal notice to all 27 Member States for incomplete transposition.
What happens to my current energy label?
It stays valid for its term. The Directive requires a closed A to G scale, but lets Member States that rescaled between 1 January 2019 and 28 May 2024 postpone until 31 December 2029. RVO expects the new Dutch scale, without the A+ to A++++ classes, in 2030.
Sources
Directive (EU) 2024/1275 on the energy performance of buildings (recast)EUR-Lex · 8 May 2024
Directive (EU) 2024/1275: document information and datesEUR-Lex
Commission Delegated Regulation (EU) 2026/52 amending Annex III to Directive (EU) 2024/1275EUR-Lex · 4 May 2026
Besluit van 21 april 2026 tot wijziging van het Besluit bouwwerken leefomgeving (eerste tranche EPBD IV), Stb. 2026, 103Officiële bekendmakingen · 7 May 2026
Kabinet start internetconsultatie tweede tranche emissievrije gebouwen volgens Europese richtlijnMinisterie van BZK · 30 April 2026
Show all 12 sourcesShow the first 6 only
Tijdlijn ontwikkelingen EPBD IVIPLO · 4 September 2026
EPBD IVRVO · 23 September 2026
Energielabel utiliteitsgebouwenRVO · 13 October 2026
Gebouwautomatiserings- en controlesysteem (GACS)RVO · 25 September 2026
Energielabel C kantorenRVO · 20 July 2026
The Commission calls on EU countries to transpose the reinforced rules on the energy performance of buildingsEuropean Commission · 15 July 2026
Related
Glossary · 26
Car park physically adjacent to a building
A car park which is intended for the use of residents, visitors or workers of a building and which is located within the property area of the building or is in the direct vicinity of the building.
A fixed or mobile, on-grid or off-grid interface for the transfer of electricity to an electric vehicle which is capable of recharging only one electric vehicle at a time, excluding devices of 3,7 kW or less whose primary purpose is not recharging (Article 2, point (48), of Regulation (EU) 2023/1804).
A designated space for parking at least one bicycle.
Energy performance certificate
A certificate, recognised by a Member State or by a legal person designated by it, which indicates the energy performance of a building or building unit, calculated in accordance with a methodology adopted pursuant to Article 4.
The area of the floor of a building needed as parameter to quantify specific conditions of use that are expressed per unit of floor area and for the application of the simplifications and the zoning and allocation or re-allocation rules.
A tailored roadmap for the deep renovation of a specific building in a maximum number of steps that will significantly improve its energy performance.
Energy performance of a building
The calculated or metered amount of energy needed to meet the energy demand associated with a typical use of the building, which includes energy used for heating, cooling, ventilation, domestic hot water and lighting.
A standard adopted by the European Committee for Standardization, the European Committee for Electrotechnical Standardization or the European Telecommunications Standards Institute and made available for public use.
Show all 26Show fewer
The maximum calorific output, expressed in kW, specified and guaranteed by the manufacturer as being deliverable during continuous operation while complying with the useful efficiency indicated by the manufacturer.
Building automation and control system
A system comprising all products, software and engineering services that can support energy-efficient, economical and safe operation of technical building systems through automatic controls and by facilitating the manual management of those technical building systems.
Life-cycle global warming potential
An indicator which quantifies the global warming potential contributions of a building along its full life cycle.
A common repository for all relevant building data, including data related to energy performance such as energy performance certificates, renovation passports and smart readiness indicators, as well as data related to the life-cycle GWP, which facilitates informed decision making and information sharing.
Technical equipment of a building or building unit for space heating, space cooling, ventilation, domestic hot water, built-in lighting, building automation and control, on-site renewable energy generation and energy storage, or a combination thereof, including those systems using energy from renewable sources.
Pay-as-you-save financial scheme
A loan scheme dedicated exclusively to energy performance improvements where a correlation is established in the designing of the scheme between the repayments on the loan and the achieved energy savings, also taking into account other economic factors such as the indexation of the energy cost, interest rates, increased asset value and loan re-financing.
National, regional or local authorities and entities directly financed and administered by those authorities but not having an industrial or commercial character (Article 2, point (12), of Directive (EU) 2023/1791).
Whole-life-cycle greenhouse gas emissions
Greenhouse gas emissions that occur over the whole life cycle of a building, including the production and transport of construction products, construction-site activities, the use of energy in the building and replacement of construction products, as well as demolition, transport and management of waste materials and their reuse, recycling and final disposal.
Minimum energy performance standards
Rules that require existing buildings to meet an energy performance requirement as part of a wide renovation plan for a building stock or at a trigger point on the market such as sale, rent, donation or change of purpose within the cadastre or land registry, in a period of time or by a specific date.
Operational greenhouse gas emissions
Greenhouse gas emissions associated with the energy consumption of the technical building systems during the use and operation of the building.
A building with a very high energy performance, as determined in accordance with Annex I, which is no worse than the 2023 cost-optimal level reported by Member States pursuant to Article 6(2) and where the nearly zero or very low amount of energy required is covered to a very significant extent by energy from renewable sources.
Mechanisms incentivising mortgage lenders to establish a path to increase the median energy performance of the portfolio of buildings covered by their mortgages towards 2030 and 2050, and to encourage potential clients to improve the energy performance of their property, relying on the criteria in Article 3 of Regulation (EU) 2020/852.
The renovation of a building where: (a) the total cost of the renovation relating to the building envelope or the technical building systems is higher than 25 % of the value of the building, excluding the value of the land upon which the building is situated; or (b) more than 25 % of the surface of the building envelope undergoes renovation.
A roofed construction, with at least three car parking spaces, that does not use energy to condition the indoor environment.
A building with a very high energy performance, as determined in accordance with Annex I, requiring zero or a very low amount of energy, producing zero on-site carbon emissions from fossil fuels and producing zero or a very low amount of operational greenhouse gas emissions, in accordance with Article 11.
All measures that are necessary to enable the installation of recharging points, including data transmission, cables, cable routes and, where necessary, electricity meters.
A renovation which is in line with the ‘energy efficiency first’ principle, which focuses on essential building elements and which transforms a building or building unit: (a) before 1 January 2030, into a nearly zero-energy building; (b) from 1 January 2030, into a zero-emission building.
A roofed construction having walls, for which energy is used to condition the indoor environment.