Skip to main content
Glossary termPublished inEPBD IV

Major renovation

Also known as ingrijpende renovatie

What does "Major renovation" mean under EPBD IV?

The renovation of a building where:
  • (a) the total cost of the renovation relating to the building envelope or the technical building systems is higher than 25 % of the value of the building, excluding the value of the land upon which the building is situated; or
  • (b) more than 25 % of the surface of the building envelope undergoes renovation.
Member States may choose to apply point (a) or (b)

Defined in / by

Last updated: 14 October 2026.

The trigger for new-build rules in existing buildings

A major renovation is the point at which rules written for new buildings reach existing ones. Article 8(1) requires the energy performance of a building undergoing major renovation, or of the renovated part, to be upgraded to meet the national minimum energy performance requirements, in so far as technically, functionally and economically feasible. Article 14(1) applies the recharging and bicycle parking rules for new non-residential buildings to non-residential buildings undergoing major renovation, and Article 20 requires an energy performance certificate after one.

The definition offers two tests, and each Member State picks one. The cost test compares the cost of work on the envelope or the technical building systems with the value of the building, land excluded. The surface test looks at the share of the envelope that is renovated. Both use 25 % as the line.

The Netherlands uses the surface test. The Bbl defines ingrijpende renovatie as a renovation of a building in which more than 25 % of the surface of the building envelope, determined according to ISSO 75.1 or ISSO 82.1, is rebuilt and the work concerns the integral envelope. Staatsblad 2026, 103 carries that definition and applies the charging duties for new non-residential buildings to ingrijpende renovatie from 29 May 2026.

For an owner, the choice of test matters more than the number. Under the Dutch surface test, an expensive replacement of all installations does not count as a major renovation if the envelope is left alone.

Questions and answers

Which test does the Netherlands use for major renovation?
What happens when a building undergoes major renovation?

Regulations

  • Energy Performance of Buildings Directive (EPBD IV)

    EPBD IV is Directive (EU) 2024/1275, the recast Energy Performance of Buildings Directive. The Netherlands put its first tranche into force on 29 May 2026 (Stb. 2026, 103), with duties staged to 2033: recharging points in existing car parks from 1 January 2027, solar and lighting control from 1 January 2028. Energy label D by 2030 is still a proposal.

    Next
    Solar installations on new public and non-residential buildings above 250 m² (Article 10(3)(a))