Pre-cabling

Also known as voorbekabeling

What does "Pre-cabling" mean under EPBD IV?

All measures that are necessary to enable the installation of recharging points, including data transmission, cables, cable routes and, where necessary, electricity meters

Defined in / by

Last updated: 14 October 2026.

More than empty pipes

Pre-cabling is the step between ducting and a working recharging point. The definition covers all measures needed to enable the installation of recharging points, and names four: data transmission, cables, cable routes and, where necessary, electricity meters. A parking space with pre-cabling should need only the charger itself.

Ducting is a lighter requirement. Article 14 describes it as conduits for electric cables, and the Directive uses the two terms side by side: new non-residential buildings with more than five spaces, and those undergoing major renovation, need pre-cabling for at least 50 % of the spaces and ducting for the rest (Article 14(1)). Article 14(1) also requires the pre-cabling and ducting to be dimensioned for the simultaneous and efficient use of the required number of recharging points, and to support a load or recharging management system where appropriate. For new residential buildings with more than three spaces, the pre-cabling must allow recharging on all spaces at the same time (Article 14(4)).

Buildings owned or occupied by public bodies get a separate duty: pre-cabling for at least 50 % of their car parking spaces by 1 January 2033 (Article 14(2)).

The Dutch Bbl uses voorbekabeling. Staatsblad 2026, 103 applies the 50 % pre-cabling rule to new and majorly renovated non-residential buildings from 29 May 2026, with conduits for the remaining spaces, and the 2033 rule for public-body buildings from 1 January 2033.

Questions and answers

What is the difference between pre-cabling and ducting?
When must public buildings have pre-cabling?

Regulations

  • Energy Performance of Buildings Directive (EPBD IV)

    EPBD IV is Directive (EU) 2024/1275, the recast Energy Performance of Buildings Directive. The Netherlands put its first tranche into force on 29 May 2026 (Stb. 2026, 103), with duties staged to 2033: recharging points in existing car parks from 1 January 2027, solar and lighting control from 1 January 2028. Energy label D by 2030 is still a proposal.

    Next
    Solar installations on new public and non-residential buildings above 250 m² (Article 10(3)(a))